Facebook

Stahl Construction on Face Book

Twitter

Stahl Construction on Twitter

Flickr

Stahl Construction on Flickr

Linked in

Stahl Construction on Linked in

 

Bidroom

Document Center

Stahl Construction Current Projects

Because our focus is on the building process – getting a building designed, built and occupied – rather than on a particular type of building or owner, we work on a variety of projects. Regardless of the type of building, the project delivery method, or the size or scope of the project, we have one goal in mind: to see that our clients get maximum value for their money.


1

2

3

4

5



Fort Madison Middle School

Carlson Companies

Helland Student Center

Council Bluffs Public Works

Urbandale Middle School

Minneapolis Public Housing Authority

White Bear Lake Public Works

Richfield City Hall

Hyatt Place    |    new construction


Stahl was the design / builder for this 136-room, four-story hotel totaling 97,000 SF. The project was designed and constructed simultaneously with a Residence Inn by Marriott; both are located at Cascade Station near the Portland, Oregon Airport.

Initially, a six-story, concrete block and pre-cast plank building the prototype required in excess of $1 million worth of steel piling, making the project financially unfeasible. Stahl was able to reduce costs by modifying the design, which reduced costs and added twelve addition rooms.

In addition, 94% of all construction waste was recycled, 20% of the building materials came from within a 500 mile radius of the project site, and actions to reduce construction pollution were taken by controlling soil erosion, waterway sedimentation, and dust generation.

Winner of the Hyatt North America Best Project Award, 2010, and 2010 Building of America Network Honoree.


Print a Project Sheet




© 2010 | Stahl Construction Company | Privacy Policy | Legal | Contact